Glossary

Click on one of the following section.

  • A-B
  • C-G
  • H-L
  • M-Q
  • R-S
  • T-Z
  • Back


    A-B Top

  • # of Lanes
  • # of Inspect Units
  • # of Slabs
  • % Environment
  • % Load Related
  • % Other
  • ADT
  • All Management Sections
  • Area
  • Area ID
  • Arterial
  • Arterial $
  • Base Budget
  • Base Budget Increase Factor
  • Base PM Split
  • Beg. Location
  • Budget Amount



    C-G Top

  • Collector
  • Collector $
  • Comments
  • Condition
  • Cost
  • Cost/Sq Yd
  • Cul-de-sac
  • Current PCI
  • Date
  • Description
  • Distress
  • End Location
  • Event Active
  • Event Date
  • Event Family
  • Event PCI
  • Event Transaction Type
  • Event Valid
  • Functional Class
  • Funding Source
  • General Code



    H-L Top

  • High Confidence Interval
  • Inflation Rate
  • Inspection Area
  • Inspection Date
  • Inspection Unit
  • Inspection Unit Length
  • Interest Rate
  • Jurisdiction
  • Last Modified
  • Length
  • Life Extension
  • Low Confidence Interval



    M-Q Top

  • Metropolitan Transportation System
  • Maintenance Date
  • Mileposts
  • Name
  • New PCI
  • No. of Inspection Units
  • Number of Surface Seals Before Overlay
  • Old PCI
  • Other
  • Other $
  • Overlay
  • Overlay Code
  • PCI
  • PCI Cap
  • PCI Date
  • PCI Effectiveness Cut-Off
  • PCI High - Low > 25
  • PCI High Value
  • PCI Low Value
  • PCI Year
  • PM%
  • Project Selection Needs
  • Project Selection PM Treatment
  • Project Selection Project
  • Project Selection Resume From Scenarios
  • Project Selection Unit Cost
  • Qty



    R-S Top

  • Read Only
  • Replacement Cost
  • Residential
  • Residential $
  • Road ID
  • Road Name
  • Road Number
  • Section ID
  • Segment Length
  • Select Management Sections
  • Severity
  • Severity Code
  • Shoulder Width
  • Slab Length
  • Slab Width
  • Special
  • Special Unit
  • Sq. Ft.
  • Start Year
  • Std. Inspection Units
  • Stop-Gap Application Interval
  • Street ID
  • Street Name
  • Surface
  • Surface Type



    T-Z Top

  • Thickness
  • Traffic Index
  • Treatment
  • Treatment Cost
  • Treatment Date
  • Type
  • Visual PCI
  • Weighting Factors
  • Width
  • Year
  • Year Constructed
  • Year of Maintenance
  • Years Between Crack Seals
  • Years Between Surface Seals
  • Years to Calculate




    Back